Support


via google maps

From MPD:

“Detectives with the Metropolitan Police Department’s Major Crash Investigations Unit are investigating a traffic fatality resulting from a traffic crash that occurred on Thursday, March 17, 2022, at the intersection of New York and New Jersey Avenues, Northwest.

Preliminary investigation revealed that at approximately 8:22 pm, a silver vehicle was travelling northbound on New Jersey Avenue, Northwest, and ran a red light. At the same time, a pedestrian was crossing New Jersey Avenue, Northwest from east to west, in a marked crosswalk when they were struck by the silver color vehicle. The pedestrian was then struck a second time by a dark color vehicle that was traveling northbound on New Jersey Avenue, Northwest, who ran the red light. Read More


renderings courtesy National Capital Planning Commission

From the National Capital Planning Commission:

“On February 16, 2022 NCPC heard an exciting vision to capitalize on the Avenue’s unique location, setting, scale, and views and reimagine it as a venue for pre-eminent outdoor events, while offering multiple transportation modes and accessible, inviting public space for people for everyday use. Three concepts offer possibilities on how to achieve this vision. The concepts are not stand-alone options and can be mixed and matched.

These concepts offer multiple opportunities to improve parks, plazas, and gathering spaces. Read More

0 Comments

From the Mayor’s Office:

“Today, Mayor Muriel Bowser and the District Department of Transportation (DDOT) announced the immediate acceleration of safety improvement projects that will better protect pedestrians as well as new reforms that will streamline and speed up the completion of safety projects.

“The work to make our roads and sidewalks safer is urgent,” said Mayor Bowser. “In addition to accelerating safety improvement projects citywide, residents deserve a faster process for having dangerous conditions on our roads and sidewalks addressed. We can and will move faster, and implementing a streamlined, less bureaucratic process is the first step in making that happen.”

Beginning this week, DDOT will accelerate roadway and intersection improvements that will enhance pedestrian safety, including the installation of speed humps, stop signs, and right turn hardening measures. DDOT will also install measures that provide visual and concrete reminders to drivers that they must drive responsibly, to include driver feedback signs, high visibility crosswalks, concrete curb extensions, and extended leading pedestrian intervals.

Also, starting now and continuing annually, DDOT will target 100 intersections that are within the District’s high-crash, high-injury corridors. Read More

0 Comments


via DDOT

From DDOT:

“The District Department of Transportation (DDOT) will temporarily close Rock Creek Park Trail between the P Street NW Ramp from Rock Creek and Potomac Parkway and Shoreham Drive NW on or about Monday, September 13, 2021, weather permitting. This closure will be in place for approximately seven months.

This temporary closure is necessary to reconstruct the existing Rock Creek Park Trail as part of the part of the Rock Creek Park Multi-Use Trail and Pedestrian Bridge project. Read More

0 Comments


June 23 Pedestrian Bridge Collapse across 295 Photo via DC Fire & EMS

From the Mayor’s Office:

“Today, Mayor Bowser and the District Department of Transportation (DDOT) announced plans to improve pedestrian accessibility across DC295 in Ward 7. In the next three years, DDOT will build three bridges–the replacement for the Lane Place Bridge, the Parkside Bridge, and the Douglass Street Bridge–to improve connectivity and pedestrian access for residents in Mayfair, Parkside, Eastland Gardens, and the surrounding communities of Deanwood and Minnesota Avenue.

“We are committed to working with the community and making the necessary investments to increase connectivity, improve safety, and build a multi-modal transportation network that works better for the residents of Ward 7,” said Mayor Bowser. “These three bridges, to be built over the next three years, are a critical component of this work and part of our overall effort to build a more connected DC.”

In the next three years, DDOT will build the following bridges: Read More

0 Comments

From DDOT:

“The District Department of Transportation (DDOT) and National Park Service (NPS) announced today that construction for the rehabilitation of the Rock Creek Park Trail and new pedestrian bridge is scheduled to begin on March 31, 2021.

“We are thrilled to finally start construction on this project which is the result of decades long collaboration with our partners and community stakeholders,” said DDOT Interim Director Everett Lott. “The planned repairs and upgrades like the addition of a pedestrian bridge will make this very popular DC destination much more enjoyable for all who use it.”

DDOT and NPS will rehabilitate and construct more than 3.7 miles of the paved, multi-use trail spanning Wards 1, 2, 3, and 4 from M Street NW in Georgetown to Broad Branch Road NW. Read More

0 Comments
×

Subscribe to our mailing list