From WMATA:
“Metro is reminding customers that beginning Saturday, February 13, the Addison Road and Arlington Cemetery stations will be closed for platform reconstruction and station improvements.
The work will continue through Sunday, May 23, to allow for platform reconstruction and other station improvements, including the installation of more energy-efficient LED lighting, slip-resistant tiles and new digital signage to improve customer communication.
Shuttle buses will replace trains at the two closed stations for the duration of the project, with no Blue Line service. Additional Yellow Line trains will operate from Franconia-Springfield to Mt Vernon Square; however, weekend service adjustments may be necessary due to other scheduled track work.
No Blue Line trains will operate.
Additional Yellow Line trains will operate between Franconia-Springfield and Mount Vernon Square stations at all times. (Yellow Line service between Huntington and Greenbelt is unaffected.)
Customers traveling to downtown D.C. from stations south of Arlington Cemetery should board a Yellow Line train. Transfer at L’Enfant Plaza if necessary.
Silver Line trains will pass through Addison Road without stopping.
Riders traveling between Largo Town Center and Rosslyn stations should use Silver Line trains.
Travel Alternatives
Free shuttle bus service will operate:
Between Rosslyn, Arlington Cemetery (during operating hours), and Pentagon every 12-15 minutes
Between Addison Road and Capitol Heights every 6-8 minutes
Customers may also consider the following regular-route bus service to get around the construction areas:
Northern Virginia
Metrobus
23A & 23B: Service between Ballston & Crystal City (operates daily)
Arlington Transit
43: Service between Court House, Rosslyn & Crystal City (Non-stop between Rosslyn & Crystal City, operates Monday-Friday)
Fairfax Connector
599: Service between Reston, Pentagon & Crystal City, non-stop between Reston & the Pentagon (operates Monday-Friday; AM rush eastbound; PM rush westbound)
698: Non-stop service between Vienna Station & Pentagon (operates Monday-Friday; AM rush eastbound; PM rush westbound)
393, 394, 395, and 396: Peak (rush hour) service to Pentagon
310: All day service to Metrorail Yellow line and D.C.
306: Pentagon on Braddock Rd. (off peak)
Addison Road
Metrobus
C21 & C22: Service between Addison Road & Largo Town Center stations (operates Monday-Friday)
C29: Service between Addison Road & Largo Town Center stations (operates Saturday & Sunday)
F14: Service between Naylor Road, Addison Rd, Capitol Heights & New Carrollton stations (operates Monday-Saturday)
Parking
During construction, parking fees will not be charged at Addison Road Station as a courtesy to customers.
About the Platform Improvement Project
Metro’s Platform Improvement Project is dedicated to making platforms safer and more accessible for all customers. As part of this multi-year project, Metro is rebuilding deteriorated platforms at 20 outdoor Metrorail stations. There are nine remaining stations scheduled for platform reconstruction: Addison Rd and Arlington Cemetery in Spring 2021; Greenbelt, College Park- University of Maryland, Prince George’s Plaza, and West Hyattsville in Summer 2021; and New Carrollton, Landover, and Cheverly in Summer 2022.
As the station platforms are reconstructed, Metro is using the time to make improvements that enhance customer experience with a higher level of safety, accessibility and convenience. Key customer experience improvements include new slip-resistant tiles, brighter energy-efficient LED lighting, larger digital display screens, new stainless-steel platform shelters with charging ports and new surveillance systems.”
Recent Stories
And regarding the fountain, Terry sends the latest on the status quo situation from NPS:
2605 Connecticut Avenue, NW Thanks to Dan and Sabrina and for sending the “Toni Sushi Update Woodley Park”
7239 Woodmont Ave Thanks to John for sending: “Mon Ami Gabi in Bethesda are closed for a remodel.”
1117 10th Street, NW Thanks to L. for sending from “next door to the CVS that is closing.”
Spring into a new dating experience with The Feels. The format fuses meditation + somatic elements like eye gazes + prompts + compliments. It’s designed to leave you feeling seen + heard. Developed in partnership with Columbia university, ongoing research shows its 2x more effective than a typical singles event + 70% of all attendees report walking out with the contact info for someone they’re excited about.
Ticket price includes a 90-min facilitated experience, unlimited wine, zero proof cocktails, light bites + access to a digital community of folks in DC who are also mindfully dating. The event takes place on Thursday, 5/16 at Yours Truly Hotel at 6:30 PM.
This is for the brave ones. You in?
Under the Gracious Patronage of Minister Adrián Nador, Chargé d’affaires Embassy of Argentina
Featuring Gustavo Ahualli, Melanie Ashkar, Juliette Di Bello, Israel Lozano
Under the Direction of José Antonio Espinal, piano accompaniment
St Mary Armenian Church Annual Spring Food Festival
Come hungry and leave happy! Experience culture, community, and cuisine all in one place. See you at the festival!!!!
Comedy Cabaret
Kick up your heels at Bad Medicine’s COMEDY CABARET extravaganza at the DC Improv Comedy Club on Tuesday, May 21st. Revel in the sights and sounds of this entertaining musical revue, with songs, dance and sketch comedy that will have